1. When the machine arrives at the site, please check whether the parts and model are consistent with the order list.If the packing is in good condition, and if there is any damage, carefully check each part of the machine for collision, deformation, displacement, loose bolts, loose wires, etc.If there is any problem above, please ask professional staff to check and test the machine before receiving and confirm that the machine will not affect normal operation.Otherwise, we have the right to reject the goods.2. The installation location and environment of the machine directly affect the normal service life and effect of the machine, so it is very important to choose a reasonable installation location and environment.Snow protection means that the machine must be installed on the horizontal ground, with good ventilation and heat dissipation, and in a dry and pollution-free environment (see details).Otherwise the consequences will be their own.In the installation and operation of the machine is strictly prohibited upside down, collision and vibration, in order to avoid parts loose and damage.4. The ice maker shall be placed on the top of the ice storage tank. The ice openings of the machine and the ice openings on the ice storage tank shall be in order to avoid the illusion of full ice.5. The power supply of the snow proof ice maker is three-phase five-wire system: frequency 50HZ, voltage 380V (smaller 342V, larger 418V). When wiring, please pay attention to R, S, T, fire line, N zero line (note: blue line is zero line), E is ground wire, and the connection box specifies ground wire.Remember: use a multimeter or pencil to make sure the hot wire is properly connected to the case can be powered, otherwise the power switch will easily burn out.6. If a system failure occurs near the previous time, it is usually a phase sequence problem.Please replace any two of the three fire lines and the green and yellow light on the phase sequence protector will go on.7. The water source should meet the drinking water standard, the external water source should be connected with PVC or PPR (0.5-3 tons 4 points, 5 tons above 6 points), the tap water (smaller 0.15mpa) is lower than this pressure, prone to the failure indication of water shortage.The larger value is 0.5mpa.Above this value, the float valve cannot be closed and leaks.When the water pressure is too high, it is recommended to lower the water supply valve in front of the machine8. The overflow port and discharge port shall be connected with tee, elbow and outer tooth joints and connected to the brine tank.When filling the brine bucket with water, open the drain valve.9. During the operation of the machine, the condenser should be cleaned every 2 to 3 months to avoid machine failure or damage caused by poor cooling of the condenser10. Before starting the machine, please put the suction head of the brine metering pump into the brine bucket and add 150g salt into the standard 30KG bucket

最新の価格を取得しますか? できるだけ早く返信します(12時間以内)

個人情報保護方針